Two auxiliary generators and one shaft generator deliver electricity for the systems of the ship. Generators are controlled by GeCon software in MINT configuration.


Power Management System (PMS) can work in three basic operational modes:

• MANUAL – complete manual control

• SEMI-AUTO – synchronizing and load-sharing is automatic; gen-set start/stop and load transfer between aux and shaft generators in manual

• AUTO – complete automatic control


PMS continuously evaluates load reserve on the bus and blocks start of the bow thruster if the load reserve is insufficient.


PMS automatically trips the non-essential consumers, if the power system is overloaded.


PMS can control up to 10 independent circuits of non-essential consumers.


Freely programmable built-in PLC functions can be used to create specific settings of behaviour by customer.